Safety practices

Safe excavation starts with good planning

Every excavation project is different, but the goal is always the same: protect people, underground infrastructure and essential services.

By planning ahead, understanding the risks and following safe excavation practices, you can reduce the risk of injury, service interruptions and costly damage.

check before you dig

Before you start

The first step is to submit a free beforeUdig inquiry at least two full business days before excavation begins.

If you don’t have an account, set up a free account first.

Once you’ve received responses from participating utility and asset owners:

  • Review all plans and instructions carefully.
  • Make sure everyone on site understands the identified hazards and safety requirements.
  • Follow any permit or site inspection requirements specified by the asset owner.
  • Walk the site and look for visible signs of underground infrastructure, such as pits, marker posts, cabinets, poles and meters.
  • If your plans expire or your scope of work changes, submit a new Inquiry before continuing.
finding underground services

Locate underground services

Plans provide an indication of where underground infrastructure may be located, but they may not show every service or its exact position or depth. Do not rely on plans alone before excavating.

Before excavation begins:

  • Look around the site for signs of underground services that may not appear on your plans, such as meters, covers, boxes or cables entering the property.
  • Engage a beforeUdig Certified Locator.
  • Ask the locator to mark the services they find on the ground.
  • Remember that a utility locate does not guarantee that every underground service has been found.
  • Where possible, ask your locator for a report or map showing what they located and any areas they could not confirm.
  • Dig trial holes (potholes) using careful hand digging, vacuum excavation or another safe method to confirm exactly where services are before using machinery nearby.
  • Keep any locator report or map with your project information.
  • beforeUdig only covers participating asset owners. Other private or non-member cables and pipes may still be present.
excavation rules

The five rules of safe excavation

Following these five steps will help you plan your work safely and reduce the risk of damaging underground infrastructure.

1

Plan

Lodge your inquiry early.

Submit a beforeUdig inquiry at least two full business days before excavation begins.

Allow enough time to receive and review plans and instructions from participating utility and asset owners.

    2

    Prepare

    Review all plans and identify hazards.

    Ensure plans from all relevant asset owners have been received.

    Make sure everyone on site understands the information provided.

    Look for signs of underground infrastructure, including pits, marker posts, service boxes and meters.

    If required, engage a certified locator to identify and mark underground services.

    3

    Pothole

    Confirm the location of services.

    Confirm the location of underground services by potholing using the method specified by the asset owner.

    This may include hand digging with a non-conductive shovel or another approved method, such as vacuum excavation, outlined in the asset owner’s plans or information pack.

    4

    Protect

    Protect exposed infrastructure

    If underground infrastructure has been exposed, take steps to protect it throughout the project.

    This may include:

    • Clearly marking exposed services
    • Installing barriers where required
    • Making sure everyone on site is aware of their location

    5

    Proceed

    Begin excavation safely.

    Only start digging once you have reviewed your plans, checked the site and confirmed where underground services are.

    Use the correct tools and safe digging methods near services. Keep plans and locate information available, and stop work if you find anything unexpected.

    Keep checking

    While you’re working

    Safe excavation doesn’t stop once digging begins.

    Remember to:

    • Brief everyone on site before work starts.
    • Follow all permit and asset owner requirements.
    • Use the correct tools for the work and maintain the required clearance distances.
    • Protect exposed cables and pipes from accidental damage.
    • Use a dedicated safety observer when carrying out mechanical excavation near underground infrastructure.
    • Stop work immediately if your project scope changes and submit a new inquiry where required.
    final check

    When the job is finished

    Before leaving site:

    • Check that no underground infrastructure has been damaged.
    • Reinstate any exposed assets in accordance with the asset owner’s requirements.
    • Keep records of your Inquiry, plans and communications until the project is complete.
    damage control

    If damage occurs

    If you damage an underground asset:

    • Stop work immediately
    • Notify the affected utility or asset owner using the contact details provided with your plans or on the Emergency Contacts page.
    • If there is an immediate risk to life or public safety such as damage to gas or electricity services , call 111.
    • Follow your site’s emergency procedures and evacuate the area where required.
    • Never attempt to repair damaged underground infrastructure yourself.
    • Report all damage to the utility asset owner , no matter how minor, as some damage may not become apparent until much later.
    resources

    Other helpful resources

    Find a certified locator

    Locate a qualified professional to assist with finding underground services.

    View More

    Homeowner help

    Practical advice for residential excavation projects.

    View More

    Emergency contacts

    Find emergency contact details for utility and asset owners.

    View More

    Duty of care

    Understand your responsibilities before and during excavation.

    View More

    Reference guide

    Access additional safety information and industry resources.

    View More

    Laws and regulations

    Learn about New Zealand requirements for working around underground infrastructure.

    View More